[Menu] ?
[języki] ?
[Sociale] ?
[Cookies] ?
[News] ?
arrow
image

Official Opening of the Wastewater Treatment Plant in Sorkwity

As part of the project, the following works were carried out: construction of a dedicated pumping station collecting incoming wastewater from three pressure pipelines; construction of a control system for the pumping station along with a coarse basket screen; construction of a new control and visualization system for the treatment plant’s operation; implementation of the second stage of mechanical wastewater treatment; construction of tanks including a retention tank, two biological reactors, and a tank for aerobic stabilization of excess sludge; construction of a shelter for storing screenings, sand pulp, and processed excess sludge; installation of an aeration system for the wastewater in the biological reactors and in the aerobic sludge stabilization chamber; construction of a covered blower station equipped with frequency converters and oxygen probes; equipping the sludge dewatering and hygienization station; construction of a receiving station for delivered wastewater; installation of an inter-facility pipeline system; renovation of the existing social building; and construction of access roads, walkways, and technological platforms.

A report from this special event is already available on Kopernik TV – we encourage you to watch the coverage!

[Formularz] ?
Contact bg

Contact us

I consent to the processing of my personal data entered by INWEST-SERWIS, based in Olsztyn, for the purpose of contact. I give my consent voluntarily and I am aware that it may be withdrawn at any time, but that withdrawal of consent does not affect the lawfulness of processing carried out before its withdrawal.
* mandatory field