Stores the status of the user's cookie consent for the current domain.
Construction of a Field Material Depot in the “Design and Build” System
ORDER IN THE FIELD OF DEFENSE AND SECURITY
Execution of construction and assembly works following the preparation of design and cost documentation for the construction of a field material depot in the “design and build” system in the Warmian-Masurian Voivodeship.
Project Details:
- Facility: Field depot
- Period: September 2022 – March 2023
- Investor: Regional Infrastructure Board in Olsztyn
Return to implementations