Stores the status of the user's cookie consent for the current domain.
Collector and Sanitary Sewer System in Jadów Municipality
Project details:
- Location: Jadów, Borzymy, Letnisko Nowy Jadów
- Year: 2011 – 2012
- Investor: Jadów Municipality
The project included the construction of a sewer network with connections, totaling 22,427 m in length, including:
- Gravity collectors PVC ø200mm, ø250mm, ø315mm
- Pressure collectors PE ø63mm, ø75mm, ø90mm, ø160mm, ø200mm
- Side gravity channels PVC ø160mm, ø200mm
- Sewer connections PVC ø160mm (432 units)
- Directional drilling
- Wastewater pumping stations (6 units)
- Restoration of asphalt, cobblestone, and crushed aggregate road surfaces
Return to implementations