[Menu] ?
[języki] ?
[Sociale] ?
[Cookies] ?
[Realizacja] ?
arrow
image

Construction of a Field Material Depot in the “Design and Build” System

ORDER IN THE FIELD OF DEFENSE AND SECURITY

Execution of construction and assembly works following the preparation of design and cost documentation for the construction of a field material depot in the “design and build” system in the Warmian-Masurian Voivodeship.

Project Details:

  • Facility: Field depot
  • Period: September 2022 – March 2023
  • Investor: Regional Infrastructure Board in Olsztyn
[Bez nazwy] ?
Contact bg

Contact us

I consent to the processing of my personal data entered by INWEST-SERWIS, based in Olsztyn, for the purpose of contact. I give my consent voluntarily and I am aware that it may be withdrawn at any time, but that withdrawal of consent does not affect the lawfulness of processing carried out before its withdrawal.
* mandatory field